For a typical London flat or house, the EPC survey takes 30 to 60 minutes and the certificate is lodged on the national register within 24 to 48 hours. From booking to certificate, a week is a safe planning figure, and two days is often possible.
The visit itself is rarely what holds things up. Delays come from booking slots, keys that don't turn up, locked lofts and assessors who batch their paperwork. This guide sets out what happens at each stage and how long commercial EPCs take by comparison.
EPC timeline at a glance
| Stage | Domestic (flat or house) | Commercial unit |
|---|---|---|
| Booking to visit | Same day to 3 working days | 2 to 7 working days |
| Survey on site | 30 to 60 minutes (up to 90 for large houses) | 1 hour to a full day |
| Calculation and lodgement | Same day to 48 hours | 2 to 5 working days |
| Typical total | 1 to 5 days | 1 to 2 weeks |
| Validity | 10 years | 10 years |
What happens during the visit
The assessor walks through every room, measures floor areas, and notes the wall and roof construction, glazing, insulation, the boiler make and model, heating controls, hot water and lighting. Domestic EPCs use RdSAP software. Nothing is drilled or lifted, and you don't need to move furniture.
- Studio or one-bed flat: around 30 minutes.
- Two or three-bed flat or terrace: 30 to 45 minutes.
- Large house with extensions: up to 90 minutes.
Expect a few photos of the boiler, radiators, windows and loft. Those back up what goes on the certificate.
When the certificate becomes valid
An EPC is only valid once it's lodged on the register. After that, anyone can look it up on GOV.UK's Find an energy certificate service. Good assessors lodge the same day or the next working day. Others wait until the end of the week, so ask when lodgement will happen, not just when the visit is.
To see whether a property already has a valid certificate before you book, here's how to check an EPC on the register.
Need help with this service in London?
Tell us your postcode and our team will confirm pricing, availability and the best
certificate package for your portfolio.
Legal deadlines if you're selling or letting
Under the government's EPC guidance, an EPC must be commissioned before a property is marketed. You then have 7 days to obtain it, with a further 21 days allowed if you've made all reasonable efforts. Trading Standards can issue a £200 fixed penalty per dwelling for breaches.
In practice, Rightmove and Zoopla listings from most agents won't go live without the rating, so the real deadline is usually your listing date.
If the new certificate comes back F or G, you can't let the property until it's improved or exempt. See whether you can rent a property with an EPC rating of F.
What slows an EPC down
- No access on the day. Tenant out, key safe code wrong, concierge not told. The most common cause of a rebooking.
- Locked or blocked loft hatch. The assessor then has to assume default insulation, which can lower the rating.
- No evidence of upgrades. Cavity wall or underfloor insulation that isn't visible needs paperwork to be credited.
- Unusual buildings. Mixed-use buildings or flats above shops may need a commercial EPC instead. See our commercial EPC guide.
- Peak weeks. Late spring and early autumn are busy for lettings, so book early.
Want to save time?
Book your property service with Property Motion and let our team confirm the right
service, availability and next steps.
How to get your EPC faster
Before the visit
- Send the full address including flat number, and any access notes.
- Clear the loft hatch and the cupboard where the boiler or cylinder sits.
- Have invoices ready for insulation, boilers or windows fitted since the last EPC.
Book it with everything else
If you're preparing a listing, the assessor can visit on the same day as your property photography and floor plan, which means one set of keys and one access arrangement. Prices for the EPC itself are in our EPC cost guide.
Need one this week? Book an EPC online. Same-day assessments are available in every London borough.
If you're letting, book the gas safety check and EICR for the same visit. Our landlord certificates guide lists everything a London let needs.
Keep reading
Frequently asked questions
Around 30 to 60 minutes for most homes. Large houses with several extensions can take up to 90 minutes.
Usually within 24 to 48 hours, once the assessor lodges it on the national register.
Yes, if you book an assessor who offers same-day visits and same-day lodgement. Ask about both when you book.
Not necessarily. The assessor just needs access to every room, the loft and the boiler. A tenant, agent or key safe works fine.
Small units can be surveyed in about an hour. Larger buildings take longer, and the report usually takes a few working days to produce.
Ten years from lodgement, unless a newer EPC is produced for the same property.
Book an EPC in London
Property Motion arranges EPCs, gas safety certificates and EICRs across London, with fast turnaround for landlords and letting agents.
